• OEM&ODM Quality Forged Brass Bibcock (AV2014)
  • OEM&ODM Quality Forged Brass Bibcock (AV2014)
  • OEM&ODM Quality Forged Brass Bibcock (AV2014)
  • OEM&ODM Quality Forged Brass Bibcock (AV2014)
  • OEM&ODM Quality Forged Brass Bibcock (AV2014)
  • OEM&ODM Quality Forged Brass Bibcock (AV2014)

OEM&ODM Quality Forged Brass Bibcock (AV2014)

Material: Brass
Structure: Double Hole
Surface Treatment: Gold Plated
Samples:
US$ 2/Piece 1 Piece(Min.Order)
| Order Sample
brass cock valve
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
OEM&ODM Quality Forged Brass Bibcock (AV2014) pictures & photos
OEM&ODM Quality Forged Brass Bibcock (AV2014)
US $1.1-2 / Piece
Min. Order: 2,000 Pieces
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
AV2014
Style
Modern
Outlet Style
Waterfall
Opening Way
Revolving Type
Pull Out Spray
Without Pull Out Spray
Number of Handles
Single Handle
Function
Magnetization
Purified Water Outlet
Without Purified Water Outlet
Hot and Cold Water
Cold
360 Swivel
Not Rotatable
Installation Type
Wall Mounted
Size
1/2 Inch
Raw Material
Forged Brass
Shape
Angle Type
Handle
Brass
Transport Package
Standard Export Package
Specification
1/2"M
Trademark
ITALY
Origin
Taizhou, China
HS Code
84818090
Production Capacity
30000000PCS/Year

Packaging & Delivery

Package Size
20.00cm * 15.00cm * 20.00cm
Package Gross Weight
1.000kg

Product Description

               OEM&ODM Quality Forged Brass bibcock (AV2014)
                       1/2~1INCH, 8YEARS WARRANTY

SPECIFICATION


1) Material: Brass CU>57%, Pb<3%.

-Hpb57-3, Hpbb59-3, CW614N, CW617N, DZR


2) Main parts: Full brass body and ball, Aluminum Handle, brass rosette

3) Size: 1/2" ~1"

4) Medium: Water, Oil, gas

5) Pressure: PN25

6) Thread standard: ISO228

7) Handl types can be, such as iron hande, aluminum handle, butterfly handle...

8) Surface

Nickel plating, chromed plating and water polishing
Model: AV2014 Material Pressure Seal
Size: 1/2"BSP CW617N or CW602N PN25 Top PTFE
Body/stick / handle /plug/ hose
 
forged brass 
 
Delivery Way:
By sea:  
Asia: 7~10 Days from China to local Port .
Other country: wintin 30~35days to Local port .
By Air
By Express: within 3~5 days to customers office or home .

We offer one-stop services to your address or local port;
EXW-Term, Shipping via specified forwarder and shipping company 

 SAMPLES TERM:
With our current mould , samples can be offer within 10days after confirmed ;
ODM with customers drawings or samples: it will take 20 days to make new mould and offer samples 

BIBCOCKS
OEM&ODM Quality Forged Brass Bibcock (AV2014)


PROCESS-TEST
OEM&ODM Quality Forged Brass Bibcock (AV2014)



COMPANY VIEW

OEM&ODM Quality Forged Brass Bibcock (AV2014)

OEM&ODM Quality Forged Brass Bibcock (AV2014)






OUR SERVICES
OEM&ODM Quality Forged Brass Bibcock (AV2014)

Samples:  
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you.

Price Terms:
FOB, CFR,CIF.etc.

Payment Terms: 
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance

Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our normal package.


 Quality control and inspection:

OEM&ODM Quality Forged Brass Bibcock (AV2014)

1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step 
3)  Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5)  Third Party inspection Such as CE, SABS and so on
 6)  Original authorization through ISO9001:2008

Send your message to this supplier

*From:
*To:
avatar Mr. Anson
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now