Nickel Plated Brass EMC Cable Connector (ZIC-70001)

Material: Copper
Connection: Male
Surface Color: Nickel
Raw Material: Brass/ Stainless Steel
Inner Washer: Stainless Steel
Seal: NBR Oring
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
ZIC-70001
Transport Package
Plastic Bag, Inner Box, Carton
Specification
M63
Trademark
ITALY
Origin
Zhejiang, China
HS Code
74122010
Production Capacity
5000000 PCS/Year

Product Description

NICKEL PLATED BRASS MEC CABLE CONNECTOR (ZIC-70001)





Material: Nickel-plated brass


Contact disc: Nickel-plated brass


Thread: PG, M, NPT


O-ring: NBR


Temperature range: -40°C / +100°C


Protection class: IP 68


Properties: For a quick installation of partially dismantled cables as well as thoroughly shielded cables


Outside diameter                                                                   Inner diameter  Hex dia. Thread length
M12X1.5 3-6.5 14 6 100
M16X1.5 5-9 17 7 100
M20X1.5 9-13 22 8
M25X1.5 11-16 27 10
M32X1.5 14-21 34 11
M40X1.5 19-27 43 12
M50X1.5 22-32 55 13
M63X1.5 34-44 68 14 12

OUR SERVICES

Samples:  
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT  MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC 
Payment Terms: 

1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,   D/P

Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our normal package.

 Quality control and inspection:

1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step 
3)  Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5)  Third Party inspection Such as CE, SABS and so on
 6)  Original authorization through ISO9001:2009

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Plant Area
3478 square meters
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment