Brass Forged Y-Strainer Valve (AV6011)
Material: Brass CU>58%, Pb<2.5%
Standard: BS.
Size: 15mm
Working Temperature: -20 <T<180
Pressure: PN20
Mould No. |
2.Material: |
3.Technics: |
4.Packaging & Delivery |
|
AV6011 |
Body-Brass:Hpb 57-3Hpb 59-1CW617NCW614NDZRlead free brass
Bonnet-Brass as above
Stem-Brass with chrome plated OR iron with chrome plated or not
Sealing-PTFE OR plastic |
Temperature: -20°C≤T≤150°C
Pressure: P≤3.0MPa=30bar=435psi
Medium: Water
Thread: ISO228 standard-BSP, NPT
Surface treatment: brass yellow,nickel plated,chrome plated, polished.
Produce standard: EN1254-2
|
Packaging Detail:plastic bag,inner box and outer export standard carton
|
|
10mm to 64mm |
Delivery timel:35~40 days |
|
|
|
|
OUR SERVICES
WHEN CAN I GOT THE QUOTATION
We usually quote within 24 hours after we get your inquiry ; if you are very urgently to get the price , pls. call us at once or leave message on online chat or tell us you Tel number, we will regard your inquiry priority.
Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2) We will start to have mass production when confirm our sample and 30% T/T deposit received.
3) Quality is under the control and supervision during the production.
4) Packing information will be confirmed before the production finished, If no special requirment, using our normal package.
Quality control and inspection:
1) Will be check by QC when Material & accessories inspection up arrival
2) In line control on Each Step
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5) Third Party inspection Such as CE, SABS and so on
6) Original authorization through ISO9001:2008