Male Elbow-adaptor with external thread(IC-SL-2001)
Technics : Forged
Connection : PEX Tee
Size:16mm-20mm or 1/2"-1"
Shape : Equal and Reduce
Customized support : OEM, ODM
Material : normal brass or CW617N
Size |
Material |
Surface color |
Thread |
Packing |
Remark |
Standard |
Brass/DZR/Bronze |
customized |
BSP/BSPT/NPT |
standard or colorful |
OEM&DOM |
|
|
|
|
|
|
For PEX pipe
Material:Brass (Cu>57%, Pb<2.5%), Lead free brass , DZR brass
Thread standard:IS0228
Quality control:ISO9001/2008., CE, SGS
Serious quality test process, 9 years old experience mastor monitor...
Size:
Elbow-adaptor with external thread, 16 - R 1/2"
Elbow-adaptor with external thread, 16 - R 3/4"
Elbow-adaptor with external thread, 20 - R 1/2"
Elbow-adaptor with external thread, 20 - R 3/4"
Elbow-adaptor with external thread, 25 - R 3/4"
Elbow-adaptor with external thread, 32 - R 3/4"
Relative products:Fittings for PEX pipe, Compression fittings-tee, elbow, coupling, union, brass screwed fittings, copper fittings, relative brass ball valve, gate valve, angle valve, check valve...Equal 90elbow for PEX pipe
About PEX fittings there are more optional>>>>
Refer Valves and Fittings, we can offer >>>>>
OUR SERVICES
Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2) We will start to have mass production when confirm our sample and 30% T/T deposit received.
3) Quality is under the control and supervision during the production.
4) Packing information will be confirmed before the production finished, If no special requirment, using our
normal package.
Quality control and inspection and Packing :
1) be checked by QC when Material & accessories inspection up arrival
2) In line control on Each Step
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5) Third Party inspection Such as CE, SABS and so on
6) Original authorization through ISO9001:2020