Canada Quality Lokable Brass Ball Valve(AV6021A)
Material: Quality brass standard ,CW617N or DZR ,or Lead Free
Thread: ISO228
Quality control: CE, ISO9001/2008
Property: Hot forging or hot stamp
Surface : Sand finish brass color or nickle plated color
Size : 1/2"-1"
Ball: Brass ball with polish and chrome plated
Seal: Top PTFE
Stem : brass stem with O-ring seal
Pressure testing : we can test the items one by one and the pressure will be PN25 ,any leaking will be sorted out
Quality control: when produce on machine ,we check all the dimension as per drawings and after finish testing pressure ,also we will choose some pieces to test again
Package : normally neutral package , also we can design the package as per customers special requirements such as color packing etc
Transport : normally by sea
Service: Customers questions we can anser within 12 hours and any complain in quality we can give response within 12 hours ,any compalint we can improve and replace of the defective pcs with free of charge
Size |
Material |
Thread |
Surface |
Pressure |
Packing |
Payment |
Standard |
|
|
1/2"-1" |
Brass |
BSP or NPT |
Sand Blast |
PN25 |
Neutral or Color |
T/T or LC |
ISO2280 |
|
|
Valves
Our Services
Samples
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2) We will start to have mass production when confirm our sample and 30% T/T deposit received.
3) Quality is under the control and supervision during the production.
4) Packing information will be confirmed before the production finished, If no special requirment, using our normal package.
PACKAGE
Quality control and inspection:
1) Will be check by QC when Material & accessories inspection up arrival
2) In line control on Each Step
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5) Third Party inspection Such as CE, SABS and so on
6) Original authorization through ISO9001:2008
COMPANY VIEW & QC