• No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
  • No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
  • No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
  • No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
  • No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
  • No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings

No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings

Connection: Screw
Head Code: Round
Material: Copper
Application: Chemical
Customized: Customized
Certification: ISO14001, SGS
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
PEX-013
Warranty
24 Months
Color
Golden/Nickel
Raw Material
Lead Free Brass
Connect
Pex Pipe Fitting
H.S, Code
74122010
Kind
Sleeve Compensator
Type
Horizontal
Surface Treatment
Silver Plating
Transport Package
Bubble Bag, Inner Box, Carton
Specification
16mm
Trademark
ITALY
Origin
Zhejiang, China
HS Code
74122010
Production Capacity
5000000PCS/Year

Product Description

Transition joint (PEX-013)
For PEX pipe
Material: Brass (Cu>57%, Pb<2.5%)

Thread standard: IS0228
Quality control: ISO9001/2008., CE, SGS
Serious quality test process, 9 years old experience mastor monitor...
Size:

Transition joint 20 - 16
Transition joint 25 - 16
Transition joint 25 - 20
Transition joint 32 - 25
Transition joint 40 - 20
Transition joint 40 - 25
Transition joint 40 - 32
Transition joint 50 - 32
Transition joint 50 - 40
Transition joint 63 - 50

 


ITEM
Designation Material Pressure
PN20
Samples 
1 Handle Iron /chromed/PVC cover
2 Body Brass, CW617N Pack&Delivery With our current mould , samples can be offer within 10days after confirmed ;
ODM with customers drawings or samples: it will take 20 days to make new mould and offer samples 
3
 
Size 20 - 16
Transition joint 25 - 16
Transition joint 25 - 20
Transition joint 32 - 25
Transition joint 40 - 20
Transition joint 40 - 25
Transition joint 40 - 32
Transition joint 50 - 32
Transition joint 50 - 40
Transition joint 63 - 50
Delivery Way:
By sea:  
Asia: 7~10 Days from China to local Port .
Other country: wintin 30~35days to Local port .
By Air
By Express: within 3~5 days to customers office or home .

We offer one-stop services to your address or local port;
EXW-Term, Shipping via specified forwarder and shipping company 
No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
 
No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings
No Lead Copper Connector Pex Fittings Male Female Thread Elbow Tee Busing Sliding Fittings




Relative products: Fittings for PEX pipe, Compression fittings-tee, elbow, coupling, union, brass screwed fittings, copper fittings, relative brass ball valve, gate valve, angle valve, check valve...

OUR SERVICES
WHEN CAN I  GOT THE QUOTATION
We usually quote within 24 hours after we get your inquiry ; if you are very urgently to get the price , pls. call us at once or leave message on online chat or tell us you Tel number, we will regard your inquiry priority.

Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT  MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:

1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,   D/P

Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our normal package.

Quality control and inspection:

1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step
3)  Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5)  Third Party inspection Such as CE, SABS and so on
6)  Original authorization through ISO9001:2008
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Plant Area
3478 square meters
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment