This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

Brass Forged Reduce Nipple/Coupling (AV9002)

Product Details
Connection: Male
Head Code: Round
Thread Distribution: External Thread
  • Brass Forged Reduce Nipple/Coupling (AV9002)
  • Brass Forged Reduce Nipple/Coupling (AV9002)
  • Brass Forged Reduce Nipple/Coupling (AV9002)
  • Brass Forged Reduce Nipple/Coupling (AV9002)
  • Brass Forged Reduce Nipple/Coupling (AV9002)
  • Brass Forged Reduce Nipple/Coupling (AV9002)
Find Similar Products

Basic Info.

Model NO.
AV9002
Surface
Sand Blast
Material
Brass
Technics
Forged
Application
Water Pipe
Customized
Customized
Warranty
3 Years
Size
1/2 Inch
Raw Material
Brass Hpb59-1
Thread Standard
ISO228
Surface Color
Brass/Nickel/Chromed
Transport Package
Standard
Specification
1/2"M
Trademark
ITALY
Origin
Zhejiang. China
HS Code
7412209000
Production Capacity
5000000PCS/Year

Product Description

Brass Forged Reduce Nipple (AV9002)
Brass Forged Reduce Nipple/Coupling (AV9002)
Material: Quality brass Cu >57%, Pb<3%. CW612N, CW617N
Size: 1/2"x1/4", 1/2"x3/8", ~2"x1"
Thread: BSP, NPT, BPST, DIN2999
Cetified: CE, ISO9001/2008,SGS
Brass Forged Reduce Nipple/Coupling (AV9002)
Brass Forged Reduce Nipple/Coupling (AV9002)





Question and Answer
Samples:  
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you)
Price Terms:
FOB, CNF,CIF.etc.
Payment Terms: 
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our normal package.
 Quality control and inspection:
1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step 
3)  Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5)  Third Party inspection Such as CE, SABS and so on
 6)  Original authorization through ISO9001:2009

Brass Forged Reduce Nipple/Coupling (AV9002)Brass Forged Reduce Nipple/Coupling (AV9002)Brass Forged Reduce Nipple/Coupling (AV9002)Brass Forged Reduce Nipple/Coupling (AV9002)Brass Forged Reduce Nipple/Coupling (AV9002)Brass Forged Reduce Nipple/Coupling (AV9002)

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now